Monday, May 20, 2019
Ramji Bhai Vasava Essay
G.H.Patel mail service Graduate Institute of Business Management, Vallabh Vidhyanagar, Anand In the undivided Bombay province was hammered out to build earthen dams and problems face charm building a dam across the rivers Lokmata and Sadmata in northern Gujarat and further issues encountered while a proposal is made to raise the control levels of it. The objective of the case is to maximize the irrigation potential of the dam while respecting the religious sen periodnts of the people. The options are either to implement the former syllabus in its present form or the latter by convincing the people of its benefits and deal with the issues faced. The conclusion is to try and implement the new plan resulting in maximization of irrigation and revenues. PROPOSAL 1 PROPOSAL 2 Approximate constitute 1.7 Approximate toll 1.9 Water impound 4700 Water impound 5700 Full supply level -592 Full supply level-595 Highest torrent level-596 highest flood level-606 OBJECTIVES* Government ai m for economic development through agricultural development. * Build the dam fuss* Opposition of people to temple getting overcomed* People getting affected due to submerge of villagesCONSTRAIN* Location of damCRITERIA* Maximum irrigation* Minimum people affected* Maximum returns* Minimum cadence* Minimum costPRIORITY* Minimum people affected* Minimum cost* Minimum time* Minimum returns* Maximum irrigationALTERNATIVES* Convincing villages to shift temple* Resettlement of affected people* Raising crown of the templeACTION envisionGovernment should follow proposal 1 as temple was rescue using gates from flood so that minimum people are affected so the cost incurred is also low and the time required is minimum and also there is irrigation which leads to economic development. CONTINGENCY PLAN* Raising height of the temple* Go with proposal 2 if proposal 1 does not work
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.